Lodden HeyMill D18

Laboratory

HeyMill D18

Lodden

Five-axis dry milling machine with no compressor — the lab needs no compressed-air infrastructure. A 60,000 rpm spindle, an automatic ten-bur changer and milling accuracy down to one micron. It monitors bur life, alarms on breakage, and resumes from the breakpoint after an interruption, so a whole disc is not lost mid-job. JK Dent installs it in the lab, trains the team and services it.

Technical specification

Axes
5 simultaneous
A axis
360° rotation
B axis
−28° to 90°
Spindle speed
60,000 rpm
Tool changer
automatic, 10 burs
Bur shank
4 mm
Milling accuracy
down to 1 μm
Monitoring
bur life, breakage alarm, breakpoint recovery
Status light
green / yellow / red
Compressed air
not required

Figures as published by the manufacturer. Further detail by configuration — talk to us.

More in this category

Lodden HeyMill W19HeyMill W19Five-axis wet milling machine for hard materials: grade-5 titanium, cobalt-chrome, glass-ceramics and polymers. Two spindle modes — quick and high-power — move it between fine finishing and metal cutting on the same machine. It takes round disks, blocks and pre-milled titanium columns, and is aimed at angled multi-unit abutments and precision screw-retained work. JK Dent installs it in the lab, trains the team and services it.LoddenLaboratory Lodden W16W16Five-axis hybrid milling machine — wet and dry in one unit, so a single lab covers zirconia, wax, resin, glass-ceramics, titanium, pre-milled blanks and soft metals without splitting the work between two machines. High-power water-cooled spindle, tool-life monitoring and job recovery after a power cut. Compatible with mainstream CAM systems. Supplied, installed, staff-trained and maintained by JK Dent.LoddenLaboratory Lodden HeyTemp TSHeyTemp TSTS-series zirconia sintering furnace with high-purity Elema heating elements. It pre-dries the restoration and clears residual moisture before the sintering cycle, so no preheating is needed and work can go straight in. Fast and slow sintering are combined; in fast mode — with silicon-carbide heating rods — sintering time drops to about an hour. Up to 150 units per cycle, with no metal-ion contamination. Supplied, installed, staff-trained and maintained by JK Dent.LoddenLaboratory Lodden HeyTemp T5MHeyTemp T5MCompact porcelain furnace covering most lab finishing work: glass-ceramic crystallization, glazing, porcelain firing, filling, staining and ring burnout. Its small footprint lets it sit on a bench without clearing dedicated space. Installation, staff training and ongoing service — from JK Dent.LoddenLaboratory

Contact us

A site visit, measurements, and a first plan with a price range. No commitment.

Quick contact

Immediate reply during business hours.

Opening hours: Sunday-Thursday 08:00-18:00

All of Israel — from the Golan Heights to Arad

Leave a detailed message

Even outside business hours — we will get back to you.