HeyTemp TS
Lodden
TS-series zirconia sintering furnace with high-purity Elema heating elements. It pre-dries the restoration and clears residual moisture before the sintering cycle, so no preheating is needed and work can go straight in. Fast and slow sintering are combined; in fast mode — with silicon-carbide heating rods — sintering time drops to about an hour. Up to 150 units per cycle, with no metal-ion contamination. Supplied, installed, staff-trained and maintained by JK Dent.
Technical specification
- Type
- zirconia sintering furnace
- Heating elements
- high-purity Elema
- Fast mode
- silicon-carbide rods
- Fast sintering time
- about 1 hour
- Capacity
- up to 150 units per cycle
- Pre-drying
- automatic, before sintering
- Preheating
- not required
- Metal-ion contamination
- none
Figures as published by the manufacturer. Further detail by configuration — talk to us.
More in this category
HeyMill W19Five-axis wet milling machine for hard materials: grade-5 titanium, cobalt-chrome, glass-ceramics and polymers. Two spindle modes — quick and high-power — move it between fine finishing and metal cutting on the same machine. It takes round disks, blocks and pre-milled titanium columns, and is aimed at angled multi-unit abutments and precision screw-retained work. JK Dent installs it in the lab, trains the team and services it.
HeyMill D18Five-axis dry milling machine with no compressor — the lab needs no compressed-air infrastructure. A 60,000 rpm spindle, an automatic ten-bur changer and milling accuracy down to one micron. It monitors bur life, alarms on breakage, and resumes from the breakpoint after an interruption, so a whole disc is not lost mid-job. JK Dent installs it in the lab, trains the team and services it.
W16Five-axis hybrid milling machine — wet and dry in one unit, so a single lab covers zirconia, wax, resin, glass-ceramics, titanium, pre-milled blanks and soft metals without splitting the work between two machines. High-power water-cooled spindle, tool-life monitoring and job recovery after a power cut. Compatible with mainstream CAM systems. Supplied, installed, staff-trained and maintained by JK Dent.
HeyTemp T5MCompact porcelain furnace covering most lab finishing work: glass-ceramic crystallization, glazing, porcelain firing, filling, staining and ring burnout. Its small footprint lets it sit on a bench without clearing dedicated space. Installation, staff training and ongoing service — from JK Dent.
Contact us
A site visit, measurements, and a first plan with a price range. No commitment.
Leave a detailed message
Even outside business hours — we will get back to you.