Lodden CD-X3

Laboratory

CD-X3

Lodden

Ultrasonic cleaning machine for printed parts: it removes uncrosslinked resin and print supports before curing. One-button dual-acoustic-wave cleaning with deoxygenation — the step that decides surface quality before finishing. Supplied and installed by JK Dent, which stocks its spare parts.

Technical specification

Type
ultrasonic cleaning for printed parts
Method
dual acoustic wave with deoxygenation
Operation
one button, automatic

Figures as published by the manufacturer. Further detail by configuration — talk to us.

More in this category

Lodden HeyMill W19HeyMill W19Five-axis wet milling machine for hard materials: grade-5 titanium, cobalt-chrome, glass-ceramics and polymers. Two spindle modes — quick and high-power — move it between fine finishing and metal cutting on the same machine. It takes round disks, blocks and pre-milled titanium columns, and is aimed at angled multi-unit abutments and precision screw-retained work. JK Dent installs it in the lab, trains the team and services it.LoddenLaboratory Lodden HeyMill D18HeyMill D18Five-axis dry milling machine with no compressor — the lab needs no compressed-air infrastructure. A 60,000 rpm spindle, an automatic ten-bur changer and milling accuracy down to one micron. It monitors bur life, alarms on breakage, and resumes from the breakpoint after an interruption, so a whole disc is not lost mid-job. JK Dent installs it in the lab, trains the team and services it.LoddenLaboratory Lodden W16W16Five-axis hybrid milling machine — wet and dry in one unit, so a single lab covers zirconia, wax, resin, glass-ceramics, titanium, pre-milled blanks and soft metals without splitting the work between two machines. High-power water-cooled spindle, tool-life monitoring and job recovery after a power cut. Compatible with mainstream CAM systems. Supplied, installed, staff-trained and maintained by JK Dent.LoddenLaboratory Lodden HeyTemp TSHeyTemp TSTS-series zirconia sintering furnace with high-purity Elema heating elements. It pre-dries the restoration and clears residual moisture before the sintering cycle, so no preheating is needed and work can go straight in. Fast and slow sintering are combined; in fast mode — with silicon-carbide heating rods — sintering time drops to about an hour. Up to 150 units per cycle, with no metal-ion contamination. Supplied, installed, staff-trained and maintained by JK Dent.LoddenLaboratory

Contact us

A site visit, measurements, and a first plan with a price range. No commitment.

Quick contact

Immediate reply during business hours.

Opening hours: Sunday-Thursday 08:00-18:00

All of Israel — from the Golan Heights to Arad

Leave a detailed message

Even outside business hours — we will get back to you.